Licensed 309A & Master Electrician · $5 million commercial liability insuranceECRA/ESA Licence #7018446Call (416) 854-3007

Level 2 EV charging

EV charger installation planned around your actual electrical service.

A charger is only one part of the installation. Electrical Standard reviews the available capacity, charging requirements and route from the panel before recommending a dedicated circuit, managed-load option or service upgrade.

Common needs

The questions that decide the installation

Useful EV quotes depend on the electrical service and physical route—not just the charger logo on the box.

  • Is the home supplied by a 100A, 125A or 200A service?
  • What continuous charging current does the vehicle and charger support?
  • How far is the parking location from the electrical panel?
  • Is the garage attached, detached, underground or outdoors?
  • Is there panel space and sufficient calculated capacity?
  • Would load management avoid an unnecessary service upgrade?

What is included

EV charging scope

The final design is based on the equipment instructions, Canadian approvals and the Ontario Electrical Safety Code.

  • Panel, service and load-capacity review
  • Dedicated 240V circuit and correctly sized protection
  • Hardwired Level 2 charger or approved receptacle installation
  • EV energy-management and reduced-output options when appropriate
  • ESA notification and inspection coordination
  • Clear labelling, testing and homeowner handoff

How it works

Clear steps.
No mystery handoffs.

01

Send the essentials

Share the charger model, panel photos, service rating and the proposed parking location.

02

Confirm capacity and route

The electrical load and installation path are reviewed before a scope is recommended.

03

Install and coordinate ESA

The circuit and charger are installed, tested and coordinated with ESA as required.

Service questions

Useful answers
before you call.

Can I install a Level 2 charger on a 100A service?

Possibly. The answer depends on the calculated demand, existing electric loads, charger setting and available equipment options. Some properties can use a lower charging current or an approved energy-management system; others genuinely need more service capacity. The load review should decide—not guesswork.

Does an EV charger installation require an ESA permit?

Yes. ESA states that EV charger installations require an electrical notification before work starts. Electrical Standard coordinates the required notification and inspection as part of the agreed installation scope.

What photos help with an EV charger quote?

Send clear photos of the full panel, main service rating, panel directory, charger label, proposed mounting location and the route between them. Include an approximate distance and mention whether the garage is attached or detached.

Request this service

Send useful details.
Get a useful answer.

Include the Toronto location, timing, clear photos and the symptom or scope. For a commercial emergency, call directly instead of waiting on email.

These buttons open your email or messaging app with the details filled in. Review the message, attach useful photos and press send.
Call nowText photosRequest quote